iConnect Homes and Land logo
Find a Home

New Homes

Used Homes

Land & Home Packages

Get Pre-Qualified
About Us

Info

Blog

Frequently Asked Questions

Contact
(239) 985-9391
Find a Home

New Homes

Used Homes

Land & Home Packages

Get Pre-Qualified
About Us

Info

Blog

Frequently Asked Questions

Contact
(239) 985-9391
More
  1. Catalog

Gantt
3 Bed
2 Bath
1,820 Sq. Ft.
32' x 60'
3 Bed
2 Bath
1,820 Sq. Ft.
32' x 60'

Floor Plan

    Gantt floor plan home features

    Property map

    Enter your address or APN/TMS to check if this home fits on your property

    Enter your property street address or APN/TMS

    Gantt

    3 bedrooms

    2 full bathrooms

    1,820 sq. ft.

    32' x 60'

    See brochureDesign home
    Pine Manor standard features

    Construction

    • Energy Star Certified
    • Zone 2 Construction
    • Roof Pitch 3/12
    • 2 x 6 Floor joist 16” OC on 28’ Wide Homes
    • 2 x 8 Floor joist 16” OC on 32’ Wide Homes
    • 5/8” T&G OSB Floor Decking
    • 8’ Sidewalls
    • 2×4 Exterior Walls 16” OC
    • 2×4 Interior Walls
    • F/G Floor Insulation R-22 and Wall R-13
    • Fiberglass Blow-In Roof Insulation R-38
    • R-8 Insulated Overhead Ducts
    • OSB Roof Sheathing
    • Exterior Sidewal Thermowrapp Sheathing
    • OSB Endwalls with Housewrap
    • Double 2 x 4 Marriage Line Walls
    • Knockdown Finish on Flat Ceilings
    iConnect Homes and Land logo

    iConnect Homes and Land

    Affordable homes at your fingertips

    Pages

    Homes

    Gantt

    3 bedrooms

    2 full bathrooms

    1,820 sq. ft.

    32' x 60'

    See brochureDesign home
  • Florida High Winds Strapping
  • Continuous Ventilation System
  • Whole House Shut-Off
    • Energy Star Certified
    • Zone 2 Construction
    • Roof Pitch 3/12
    • 2 x 6 Floor joist 16” OC on 28’ Wide Homes
    • 2 x 8 Floor joist 16” OC on 32’ Wide Homes
    • 5/8” T&G OSB Floor Decking
    • 8’ Sidewalls
    • 2×4 Exterior Walls 16” OC
    • 2×4 Interior Walls
    • F/G Floor Insulation R-22 and Wall R-13
    • Fiberglass Blow-In Roof Insulation R-38
    • R-8 Insulated Overhead Ducts
    • OSB Roof Sheathing
    • Exterior Sidewal Thermowrapp Sheathing
    • OSB Endwalls with Housewrap
    • Double 2 x 4 Marriage Line Walls
    • Knockdown Finish on Flat Ceilings
    • Florida High Winds Strapping
    • Continuous Ventilation System
    • Whole House Shut-Off

    Exterior

    • 6/6 Vinyl Insulated Low-E Windows
    • 36×80 6 Panel Front Door W/Dead Bolt
    • Cottage Rear Door W/Dead Bolt
    • Hardie Fascia – Vinyl Soffit
    • 3 Tab Shingles – W/Ridge Cap Ventilation
    • Vinyl Lap Siding W/Color Matching Corners
    • White Window Lineals- Front Door Side
    • 1 Exterior Hose-Bib
    • 6/6 Vinyl Insulated Low-E Windows
    • 36×80 6 Panel Front Door W/Dead Bolt
    • Cottage Rear Door W/Dead Bolt
    • Hardie Fascia – Vinyl Soffit
    • 3 Tab Shingles – W/Ridge Cap Ventilation
    • Vinyl Lap Siding W/Color Matching Corners
    • White Window Lineals- Front Door Side
    • 1 Exterior Hose-Bib

    Mechanical

    • LED Lighting Package
    • 2 Can Lights in Dining Room
    • 2 Can Lights ni Primary Bedroom – Opt. to wire/brace between cans
    • 1 Exterior GFI Receptacle
    • Strip Lights over Master Bath Lavs
    • 200 Amp Main Panel Box
    • Smoke Detectors Code Specific
    • Plumb &Wire for Washer/Dryer
    • Installed Dryer Vent
    • USB Receptacle in Kitchen
    • Exterior Lantern Light – Each Exterior Door
    • Electric 40 Gallon Water Heater with Pan
    • Programmable Honeywell Thermostat
    • LED Lighting Package
    • 2 Can Lights in Dining Room
    • 2 Can Lights ni Primary Bedroom – Opt. to wire/brace between cans
    • 1 Exterior GFI Receptacle
    • Strip Lights over Master Bath Lavs
    • 200 Amp Main Panel Box
    • Smoke Detectors Code Specific
    • Plumb &Wire for Washer/Dryer
    • Installed Dryer Vent
    • USB Receptacle in Kitchen
    • Exterior Lantern Light – Each Exterior Door
    • Electric 40 Gallon Water Heater with Pan
    • Programmable Honeywell Thermostat

    Interior

    • Lifestyles “Lite” ½” Drywall T/O Orange Peel
    • Glued and Screwed (not nailed)
    • Mohawk Firecreek Carpet
    • Rebond Carpet Pad &Carpet Bar
    • Diamondflor Roled Lnioni al Wet Areas
    • 2 Panel Square Interior Doors
    • Round Doorknoks Instaled T/0
    • Floor Mounted Coorstops
    • 3” Crown &Base Trim Instaled CA/ & MBR
    • 2 1/4” Window and Door Trim CA/ & MBR
    • 3” Flat Trim & 1 1/2” Window & Door Trim in Non-C/A
    • Décor Valance Package
    • 2” Mini Blinds Instaled
    • 6” Plus Door and Drawer
    • Lifestyles “Lite” ½” Drywall T/O Orange Peel
    • Glued and Screwed (not nailed)
    • Mohawk Firecreek Carpet
    • Rebond Carpet Pad &Carpet Bar
    • Diamondflor Roled Lnioni al Wet Areas
    • 2 Panel Square Interior Doors
    • Round Doorknoks Instaled T/0
    • Floor Mounted Coorstops
    • 3” Crown &Base Trim Instaled CA/ & MBR
    • 2 1/4” Window and Door Trim CA/ & MBR
    • 3” Flat Trim & 1 1/2” Window & Door Trim in Non-C/A
    • Décor Valance Package
    • 2” Mini Blinds Instaled
    • 6” Plus Door and Drawer

    Kitchen

    • Whirlpool 18’ FF Refrigerator
    • Whirlpool 30” Deluxe Electric Range
    • Stainless Appliances
    • Mission Cabinet Doors W/Round Knobs
    • Mar Resistant Rolled Edge Laminate Countertops
    • 1 Row Ceramic Tile Backsplash
    • Shelf over Refer
    • Vinyl Lined Bank of Drawers
    • 3⁄4” Vinyl Lined Base & O/H’s Cabinets T/O
    • Full Extension Drawer Guides
    • Metal Single Lever Faucet with Sprayer
    • Stainless Steel Sink
    • 40” Overhead Cabinets
    • Whirlpool 18’ FF Refrigerator
    • Whirlpool 30” Deluxe Electric Range
    • Stainless Appliances
    • Mission Cabinet Doors W/Round Knobs
    • Mar Resistant Rolled Edge Laminate Countertops
    • 1 Row Ceramic Tile Backsplash
    • Shelf over Refer
    • Vinyl Lined Bank of Drawers
    • 3⁄4” Vinyl Lined Base & O/H’s Cabinets T/O
    • Full Extension Drawer Guides
    • Metal Single Lever Faucet with Sprayer
    • Stainless Steel Sink
    • 40” Overhead Cabinets

    Bathroom

    • Mission Cabinet Doors W/Round Knobs
    • Mar Resistant Reled Edge Laminate Countertops
    • 1 Row Ceramic Tile Backsplash
    • Vanities Built to 36” Height – Al Baths
    • Metal Faucets ni Sinks, Tubs &Showers
    • Elongated Water Saver Commodes
    • China Lavs with 24”x 36” Mirror Above
    • Exhaust Fans Installed in Al Baths
    • 1 Piece Fiberglass Tub/Shower in Hall Bath
    • Master Showers Fiber Glass model Specific
    • Radiance Stand Alone Tub ni Master Bath
    • Mission Cabinet Doors W/Round Knobs
    • Mar Resistant Reled Edge Laminate Countertops
    • 1 Row Ceramic Tile Backsplash
    • Vanities Built to 36” Height – Al Baths
    • Metal Faucets ni Sinks, Tubs &Showers
    • Elongated Water Saver Commodes
    • China Lavs with 24”x 36” Mirror Above
    • Exhaust Fans Installed in Al Baths
    • 1 Piece Fiberglass Tub/Shower in Hall Bath
    • Master Showers Fiber Glass model Specific
    • Radiance Stand Alone Tub ni Master Bath

    Other

    • Merit 1 (Year 1) Warranty
    • Merit 7 (Year 2 – 7) Warranty
    • Merit 10 (Year 2-10) Warranty
    • Merit 1 (Year 1) Warranty
    • Merit 7 (Year 2 – 7) Warranty
    • Merit 10 (Year 2-10) Warranty
    Map
    Sign up
    Sign in

    Help

    Contact usTerms of ServicePrivacy PolicyAccessibility

    Get started with iConnect Homes and Land

    Find, design, and order your next home in a few clicks.

    Sign up

    Dealer License #:

    Powered by BuildTrove.com
  • Pine Manor
  • Gantt
  • View similar homes

    Osborne floor plan home features

    Osborne floor plan home features

    Osborne

    Built by: Champion Lake City

    Prime Series

    3 Bed | 2 Bath | 1,820 Sq. Ft. | 30' 4" x 60' | 2 Sections

    View detailsDesign home
    Lake manor 3260h32p03 floor plan home features

    Lake manor 3260h32p03 floor plan home features

    Lake Manor 3260H32P03

    Built by: Champion Lake City

    Lake Manor

    3 Bed | 2 Bath | 1,820 Sq. Ft. | 30' 4" x 60' | 2 Sections

    View detailsDesign home
    Eastman floor plan home features

    Eastman kitchen and hero home features

    Eastman

    Built by: Champion Lake City

    Cypress

    3 Bed | 2 Bath | 1,820 Sq. Ft. | 32' x 60' | 2 Sections

    View detailsDesign home
    Douglas floor plan home features

    Douglas hero and kitchen home features

    Douglas

    Built by: Champion Lake City

    Cypress

    3 Bed | 2 Bath | 1,820 Sq. Ft. | 32' x 64' | 2 Sections

    View detailsDesign home